| Website - Description of the process |
|
On average, the process of site creation takes about 20 working days. However, if the site requires the customer faster, we can significantly shorten the time. We can do this by bringing to perform a larger number of professionals working on weekends. As an alternative, we can start programming the site without the approval of the site layout, although in this case, labor increases. The reason for the increase of labor is that after the approval of the site layout we have to make changes to the already debugged code. It is therefore natural that the urgency of creating a site involves increasing the project budget. The process of creation web sites in our studio consists of several stages. Interviewing.Manager of our company is conducting an interview with the Customer. During the interview recorded goal of creating a site filled Brief on the site (it is desirable that the customer has already had some options on the questionnaire before the start of the interview). For additional information on some items questionnaire, you can find in this article. Also at this stage, we ask the client to make available its graphic and textual information which is relevant to the developed by the site and logo (preferably in vector format).
Preparation of technical assignment and the contract for site development. For sites with very sophisticated functionality, we conclude a separate agreement to develop a technical task. The development program for usability testing increases the total cost of the project. However, the correct interpretation of results is increasing the likelihood of obtaining user-friendly of web site. On average, this phase takes 3 working days. Adoption of the treaty and technical buildings at the site developed by the customer.
The next day, following the agreement of all the proofs we are starting programming of site. At the same time, our copywriter can start drafting the text of filling. Creating a site. Site testing. Placing of a site in operation. During the 3 months following the implementation of site we are fixing issues that were not detected at the stage of testing and answer questions that relate to filling and operation of the site. In the event that a client needs more long-term technical support there is a separate contract. In the event that the operation must substantially change the functionality of the site or design, such work is carried out under a separate contract. |